top of page

Collaborating with the CBRE team on the remodel of the historic Salt Lake Hardware Building was a real passion project for our team. From the outset, we recognized the importance of preserving and celebrating the building's rich history and industrial character. The Salt Lake Hardware Building carries a unique charm with its heavy timber structures and exposed masonry, and we were determined to design a space that respected these features while enhancing them and adding an updated atmosphere.

The design process was a meticulous endeavor, as we wanted to strike the perfect balance between preserving the rough edges and raw beauty of the building's architecture while incorporating elements that would elevate the overall aesthetic.

Our team delved deep into research, examining historical photographs and architectural plans, in order to develop a design that paid homage to the building's past while infusing it with a fresh, contemporary appeal.

In our process, we recognize the importance of long-term viability and flexibility. To ensure the longevity of the remodel, our team collaborated closely with the building maintenance and management team. Together, we meticulously selected furniture, fixtures, and equipment (FF&E) that were not only aesthetically pleasing but also designed to withstand the test of time. By future-proofing the FF&E selections, we ensured maximum adaptability and versatility for the evolving needs of the building's occupants.

Another key consideration in the project was the ability to accommodate various events and configurations. Understanding the significance of the main level and third level atrium and lobby spaces as gathering areas, we designed the layout and furnishings with multiple event scenarios in mind. This foresight enabled the spaces to seamlessly transform and adapt to different functions, whether it be a corporate event, a networking session, or a casual gathering.

Project Data


Project Number

2025


Project Title

Salt Lake Hardware Building Commons


Project Location

Salt Lake City, Utah


Project Size/Area

25,500 SF


Project Type

Common Space Upgrade


Project Status

Built


Project Duration

1 year


Completion Year

2021


Client

KBS, Inc


Architect

Gensler


Interiors

Modern Out West


Construction

DAW, Inc


Furniture

Interior Solutions

Find us in the digital world

LinkedIn

Behance

Contact us via the following

cell: 931.319.4647

trent@modernoutwest.com

Or swing by and chat

380 West 400 North

Salt Lake City UT 84102

Enter by the side door

 

Let's build something beautiful, together.

Thanks for submitting!

bottom of page